Turbo Certificate Short Oesterreichische Post AG The product related information contained herein is exclusively for information purposes only, intended for current investors or in case these products are displayed further to an individual search. The information does not constitute a recommendation or an offer to buy or an invitation to make a respective offer in relation to any of the products described herein.
Change+0.020 (+3.60%) BidEUR 0.570 AskEUR 0.580 Last updateMay 17, 2024
10:05:15.678
UTC
Underlying price 31.90 (-0.31%) BarrierEUR 35.64 Barr. Dist. %11.74% Leverage5.50
Name
Turbo Certificate Oesterreichische Post AG
ISIN / WKN
AT0000A2TJ43 / RC04WT
Underlying price
EUR 31.90 (-0.31%)
May 17, 2024 10:05:14.890
Strike
EUR 37.37
Leverage
5.50
Long/ short
Short
Denomination / nominal
1 unit
Multiplier
1:10
Product currency
EUR
Listing
Vienna, Stuttgart
About the term
Initial valuation date
Sep 23, 2021
Issue date
Sep 24, 2021
Final valuation date
-
Maturity date
open-end
Product classification
Leverage Product with Knock-Out
Security type (eusipa Nr.)
Turbo Certificate (2210)
Turbo Certificate Type
Turbo Certificate Short
Country / region of underlying
Austria
Suited market expectation
bearish
Issue price
0.58 EUR
Spread homogenised
0.10
Spread in %
1.75%
Underlying currency
EUR
Settlement method
Cash settlement
Tax treatment
Capital Gains Tax / No EU Withholding Tax
Public offer in
Austria, Germany, Italy, Hungary, Poland, Czech Republic, Slovakia, Bulgaria, Croatia, Romania, Slovenia
Comments

Turbo Certificates enable investors to participate with a leverage effect in the performance of the underlying. Short Turbo Certificates provide investors with above average profit opportunities in falling markets. If the underlying touches or surpasses the barrier (knock-out level), the Turbo Certificate expires prematurely. The investor may incur a total loss of the invested capital.

Barrier and strike are adjusted on a daily basis. In case the underlying quotes in a currency different to that of the certificate or in case the underlying is a commodity future (roll over), a deviation may occur.